The largest single‑investment Sino‑foreign joint‑venture petrochemical project in Fujian Province is being developed through a joint venture between Saudi Basic Industries Corporation (SABIC) and Fujian Energy & Petrochemical Group. At its core, the project features a 1.5‑million‑ton‑per‑year ethylene cracker—designed with an upper limit of 1.8 million tons per year, making it the world’s largest single‑unit ethylene plant—supported by 14 state‑of‑the‑art downstream processing units. Together, these facilities establish a dual‑mainline, end‑to‑end value chain centered on ethylene and propylene, enabling 100% on‑site utilization of by‑products and seamless integration with the existing Gulei refining and petrochemical park in terms of feedstock supply and utility infrastructure connectivity.
● Gulei is located on the southern Fujian Peninsula, exposed to the southeast monsoon and facing the Taiwan Strait, subject to severe marine salt‑spray corrosion and enduring a long‑term C5 corrosive environment.
● The world’s largest single‑train ethylene plant, with a scale benchmarked against international standards and extremely stringent reliability requirements for its safety protection system.
● Long-distance utility tunnels are interconnected, with extensive pipeline networks and numerous outdoor exposed sections, resulting in poor maintenance accessibility and placing a strong emphasis on long-term durability.
● Under the dual regulatory framework of Sino‑foreign joint ventures, the thresholds for material verification and quality management are stringent.
● The project has complex requirements, a wide variety of products, and involves the concurrent construction of multiple contract sections.
● The construction period spans two to three years, with diverse climatic conditions and constantly changing weather and site conditions.
● The utility tunnels, pipelines, and plant areas employ a heavy-duty anti-corrosion system, with the topcoat specially formulated to enhance resistance to salt spray and UV‑induced aging.
● The steel structures in the plant area are coated with FT intumescent fire‑protective paint, meeting the required fire‑protection rating for hydrocarbon fires.
● Develop long-life, low-maintenance ancillary systems tailored for long-distance utility tunnels to reduce the difficulty of maintenance in areas with poor accessibility.
● In compliance with the regulatory and validation requirements of Sino‑foreign joint ventures, documentation is managed in a closed-loop system with full traceability.
● Under the dual challenges of severe coastal corrosion and the world’s largest single‑unit ethylene production capacity, the solution has stood up to rigorous scrutiny in both scale and environmental conditions.
● Long‑lasting, heavy‑duty anti‑corrosion protection reduces the maintenance frequency in hard‑to‑reach areas such as utility tunnels, aligning with the requirements of continuous production.
● Integrated corrosion and fire protection reduces conflicts among multiple systems and ensures overall project schedule.
● NACE Engineers provide comprehensive on-site, end-to-end services. They promptly address clients’ temporary and specialized technical requirements, making timely adjustments across all stages—from formulation to application.
● Ensuring quality, quantity, and safe supply; while maintaining stable quality, workability is optimized to suit the specific construction conditions and weather of each contract section.
The utility tunnel, pipelines, and the protective systems for the plant area are being handed over as the project progresses, supporting the construction of the world’s largest single ethylene production unit and 14 downstream process units.