Contact Us
Phone:86-595-68861777
Address:Tangxi Industrial Zone, WanHong Road, Luojiang District, Quanzhou City, Fujian Province, China
Website:www.thnm.com
After-sales phone number:400-8646777
New Energy – Specialized Containers
Product Overview:
Product Details
Huayou Feida Group (based in Cangzhou, Hebei; founded in 2002 and a Tier‑1 supplier of high‑end equipment to CNPC, Sinopec, and CNOOC) is one of China’s earliest specialized manufacturers of custom‑designed containers. In recent years, the company has pivoted toward new energy, focusing on energy‑storage containers, prefabricated electrical cabins, and data‑center modules, with clients including state‑owned power giants such as State Power Investment Corporation, China Huaneng, and China Datang. As its energy‑storage business expands, coating‑and‑delivery requirements have become increasingly stringent: in accordance with ISO 12944, the products must meet all three corrosion‑protection classes—C3, C4, and C5—while delivery lead times have been shortened to just 2–3 days.

● Tight delivery schedule: Over 100 energy storage cabinets and prefabricated modules are produced monthly, with end-to-end delivery in just 7–10 days; by contrast, conventional three-coat painting requires 8–24 hours per coat, consuming 3–5 days solely for the coating process.
● Wide corrosion‑resistance range: The three grades—C3 for inland areas, C4 for industrial parks, and C5 for coastal chemical facilities—differ significantly, and the coexistence of multiple systems increases procurement, warehousing, and process‑related error costs.
● Cost pressures: Cangzhou is home to a high concentration of specialized container manufacturers (over 1,500), and customers are highly sensitive to coating costs; both the three‑coat material and labor expenses remain relatively high.
● Exterior upgrade: Energy storage cabinets are shifting from “industrial equipment” to “brand‑driving assets,” with companies like Jerry and Sungrow placing greater emphasis on finish gloss and color consistency.
Recommended by Xinhe: Epoxy thick‑film primer plus aliphatic polyurethane topcoat, a two‑coat system designed to achieve “primer and topcoat in one, reducing steps and boosting efficiency,” suitable for C3–C5 environments.
● C3 (Inland/Low Corrosion): One coat of epoxy thick‑film primer + one coat of aliphatic polyurethane topcoat, with a total dry film thickness ≥ 200 μm;
● C4 (Industrial Park/ Moderate Salt Spray): 1 coat of epoxy thick‑film primer + 2 coats of aliphatic polyurethane topcoat, with a total dry film thickness ≥ 280 μm;
● C5 (Coastal/Chemical/High-Corrosion): Two coats of epoxy thick‑film primer (wet-on-wet) + two coats of aliphatic polyurethane topcoat, with a total dry film thickness ≥ 360 μm.

● Wet-on-wet performance enhancement: Once the primer is surface-dry, the topcoat can be applied; intercoat waiting time is reduced from 8–24 hours to 2–3 hours. Two coats replace three, shortening the cycle by more than 40%, and C3 can be completed in a single day.
● A single set to conquer the world: For the same product, only the number of process steps and the film thickness need to be adjusted to cover C3–C5; operators require just one set of parameters, eliminating errors associated with zero‑changeover.
● High solids, low emissions: The project employs an epoxy thick‑film coating with a solids content of 81% (industry standard: 65–70%), resulting in reduced application rates and low VOC emissions, in compliance with GB 30981 and GB 37824. Both the diluent usage and the number of coating passes have been minimized.
● Decorative Bonus: The project specifies an aliphatic polyurethane topcoat with a gloss level of ≥90° (measured at a 60° angle), offering excellent gloss and color retention after aging for ≥800 hours, and accurately reproducing brand-specific colors such as Jerry Red and State Grid Green.
● Integrated Services: Integrated coating solutions save you time, effort, and money while simultaneously boosting quality and efficiency.
● Efficiency: Painting cycle reduced from 3–5 days to 2–3 days; C3 can be completed in a single day, boosting production capacity by approximately 30%.
● Corrosion resistance: C4 passes the 720-hour neutral salt spray test (no blistering, flaking, or rust); C5 meets the highest durability class specified in ISO 12944‑5.
● Quality: Adhesion rating of 0, gloss deviation ≤5 GU, color difference ΔE ≤1.0, and significantly improved appearance consistency.
● Cost: Paint consumption decreases by approximately 15%, labor costs drop by about 20%, and overall coating costs fall by roughly 18%.
● Status: Xinhe has become the core anti-corrosion coating supplier for Huayou Feida’s energy storage cabinets and prefabricated cabins, with an in-depth strategic partnership on integrated coating solutions.
