Oil, Gas & Chemicals – Petrochemicals


Product Overview:

Project Name: Sinopec Tianjin Nangang 1.2-million-ton-per-year ethylene and downstream high-end new materials industrial cluster project Industry: Petrochemicals Location: Tianjin Scope: Steel structure of the ethylene plant area, intermediate tank farm, and piping Product: Heavy-duty anti-corrosion coating + Ft intumescent fireproofing

Product Details

Project Overview

Sinopec’s Tianjin Branch has launched a world-class ethane‑cracking‑to‑ethylene integrated project, located in the Nangang Industrial Zone of the Binhai New Area in Tianjin. The project leverages a low‑cost ethane feedstock route and features a fully integrated value chain spanning polyolefins, high‑end α‑olefins, and specialty new materials, aiming to establish a core supply hub for advanced new materials in the Beijing–Tianjin–Hebei region. It stands as Sinopec’s flagship ethane‑cracking initiative.

Challenge

● Nangang is located on the Bohai Sea, in a C5 corrosive environment. Externally, it is subjected to the dual challenges of marine salt spray and the chemical conditions within the plant, making conventional coatings prone to early chalking, blistering, and red rust. 
● The ethylene plant features a dense network of high-temperature pipelines and equipment, posing a high risk of hydrocarbon fires; its steel structures must simultaneously resist corrosion and provide fire protection. 
● Benchmark projects are large in scale and subject to stringent standards; if the anti-corrosion and fire‑proofing layers operate independently, interlayer coordination is prone to issues, leading to schedule delays. 
● In northern regions, the window for low-temperature construction during winter is short, imposing stringent requirements on the coating’s ability to form a film and dry at low temperatures. 
● The project has complex requirements, a wide variety of products, and involves the concurrent construction of multiple contract sections. 
● The construction period is two to three years, with diverse climatic conditions and constantly changing weather and site conditions.

Solution

● The steel structure employs a heavy-duty anti-corrosion system consisting of “epoxy zinc‑rich primer + epoxy micaceous iron oxide intermediate coat + polysiloxane topcoat,” with salt‑spray resistance of ≥3,000 hours, ensuring a 15‑year maintenance‑free service life. 
● In the equipment area, steel structures are coated with an intumescent fire‑protective coating. This thin‑coat formulation offers high efficiency and is compatible with the anti‑corrosion layer; in the event of a hydrocarbon fire, it rapidly expands and chars to insulate against heat. 
● The tundish area and piping are selected in sections based on the process medium and temperature, with a unified bottom‑middle‑top configuration to minimize interlayer conflicts. 
● Comprehensive guidance on low-temperature winter application processes to ensure film‑forming quality within the operational window.

Advantage

● Integrated anti-corrosion and fire‑protection design—one solution addresses both risks, reducing the owner’s coordination costs. 
● Long‑lasting protection reduces the frequency of future shutdowns for maintenance, which is especially critical for ethylene plants operating in continuous production. 
● Low-VOC formulation, meeting the environmental protection requirements of green chemical parks. 
● NACE Engineers provide comprehensive on-site, end-to-end services. They ensure timely responses to clients’ temporary and specialized technical requirements, promptly implementing all necessary adjustments—from formulation to application. 
● Ensuring quality, quantity, and safe supply; while maintaining stable quality, constructability is optimized to suit the specific construction conditions and weather of each contract section, thereby guaranteeing favorable working conditions.

Result

The steel structure of the ethylene plant area, along with the intermediate tank farm and pipeline protection system, have been fully installed and successfully passed the joint acceptance inspection conducted by the owner and the general contractor. Serving as a benchmark protective demonstration project for Sinopec’s ethane cracking initiative, it has established a replicable coastal‑area ethylene protection model for subsequent similar projects.